Hours 1012
From DIDEAS Wiki
- ceb_log todo BMdoc notes hours_1012 hours_1101 hours_1102 hours_1103 lifefix_log T
- garden12 ; emg_2009 ; Enc_2010 ; AKENC ; Kknee1 ; Br46_v1 gps1 ; lifefix ; battery ; loadwasher ; elecdog ; Brushless_control ; ceb_misc_prj ; pf_top_nav ; T
wed dec 1
9a - 10:30p
- extend pre_build script to work with all controllers, add necessary support file to each project
- work with JS and ZH to discover cause of IMU scaling problem
- work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
- work with KMa to assemble and test battery board set
thur dec 2
- 9:15a - 8:15p -3
- kit to L-tronics
- update BOM and PCB docs.
- meet w/RC and ZH re statemachine bug during TS
- review diag code, email on issues.
- complete integration of shared object into IMU
- complete integration of serial number based scaling of IMU data.
fri dec 3
- 9a - 1:40p
- develope bt_config app
- 3pm - 5:30pm
- meet with RB re integration of test alg
- meet with AB on PDA app
- meet with JS on IMU operation and calb table.
- meet with RC on status
sat dec 4
- 10a - 12:30
- develope BATRCP3 inspection and test procedure.
- 1:30p - 10:30p
- work with Khang on board assembly
- work w/DG on inspection / test procedure
- revise BATMOD3 BOM
todo
- knees to MIT
- reboot PC
- rename BATMOD3s
- email GG re CA inspection, CC K and DG
- order digikey parts for BATMOD
sun dec 5
- 11:30a - 8:40p
- write testing proceedure for batrcp
- debug batrcp3.#0107
- full bat system validation, tested charger