*location [[AK-WB2]] | *location [[AK-WB2]] | ||
− | + | == 200-218-003== | |
+ | * 4-27-09 : will start testing. | ||
+ | * needs R233 and R222 shorted (solder ball) | ||
== 200-218-005== | == 200-218-005== |
Revision as of 17:10, 27 April 2009
Contents
SC/MC 2x0-218 PCA
200-218-001
- location AK-WB2
200-218-003
- 4-27-09 : will start testing.
- needs R233 and R222 shorted (solder ball)
200-218-005
- 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT. DONT CONNECT EXTERNAL BATTERY CABLE
- location ceb benchtest (MIT), used for code dev
200-218-006
- 4-25-09 : has problem with MC reset
- 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well!
200-218-007
- 4-6-09 : start bench test at 2am; finished 9:10pm (w/217-007) works well.
200-218-009
- location AK-WB1 ???
200-218-010
- 4-2-09 : ran bench test for 1.5 hrs with 217-010