Difference between revisions of "Aiw hardware"

From DIDEAS Wiki
Jump to: navigation, search
m (5)
m (pyramid)
Line 16: Line 16:
  
 
==2==
 
==2==
 +
*12-3-08 : Installed on Proto3.  SG gain needed to be reduced from 850 to 550.
 
*12-1-08 : Q&D test, connector seems good
 
*12-1-08 : Q&D test, connector seems good
  
Line 25: Line 26:
  
 
==5==
 
==5==
*12-1-08 : operational on an ankle
+
*12-1-08 : operational on PROTO3.  SG gain is 850.
 
*11-28-08 : to be tested.  May have been calibrated in OCT
 
*11-28-08 : to be tested.  May have been calibrated in OCT
  

Revision as of 23:16, 3 December 2008

PCB Hardware

system

ak1

ak2

ak3

pyramid

2

  • 12-3-08 : Installed on Proto3. SG gain needed to be reduced from 850 to 550.
  • 12-1-08 : Q&D test, connector seems good

3

  • 11-28-08 : May have been calibrated in OCT, current on test stand

4

  • 12-1-08 : Q&D test, connector seems good

5

  • 12-1-08 : operational on PROTO3. SG gain is 850.
  • 11-28-08 : to be tested. May have been calibrated in OCT

motor / assembly

drive 1

  • 11-28-08 : verified with +-1.5Amps

drive 2

drive 3

  • 11-1-08 : motor frozen

drive 4

drive 5

  • 11-28-08 : verified with +-1.5Amps

battery packs