Difference between revisions of "Hours 1012"
From DIDEAS Wiki
m |
m |
||
Line 2: | Line 2: | ||
{{Ceb_prj}} | {{Ceb_prj}} | ||
− | =dec 1= | + | =wed dec 1= |
9a - 10:30p | 9a - 10:30p | ||
**extend pre_build script to work with all controllers, add necessary support file to each project | **extend pre_build script to work with all controllers, add necessary support file to each project | ||
Line 8: | Line 8: | ||
**work with AB on bluetooth/android - seems to be related to timing and flow control in the BT | **work with AB on bluetooth/android - seems to be related to timing and flow control in the BT | ||
**work with KMa to assemble and test battery board set | **work with KMa to assemble and test battery board set | ||
− | =dec 2= | + | =thur dec 2= |
*9:15a - 8:15p -3 | *9:15a - 8:15p -3 | ||
**kit to L-tronics | **kit to L-tronics | ||
Line 16: | Line 16: | ||
**complete integration of shared object into IMU | **complete integration of shared object into IMU | ||
**complete integration of serial number based scaling of IMU data. | **complete integration of serial number based scaling of IMU data. | ||
+ | |||
+ | =fri dec 3= | ||
+ | *9a - 1:40p | ||
+ | **develope bt_config app | ||
+ | |||
+ | *3pm - 5:30pm | ||
+ | **meet with RB re integration of test alg | ||
+ | **meet with AB on PDA app | ||
+ | **meet with JS on IMU operation and calb table. | ||
+ | **meet with RC on status | ||
+ | |||
+ | =sat dec 4= | ||
+ | *10a - 12:30 | ||
+ | **develope BATRCP3 inspection and test procedure. | ||
+ | |||
+ | *1:30p - 10:30p | ||
+ | **work with Khang on board assembly | ||
+ | **work w/DG on inspection / test procedure | ||
+ | **revise BATMOD3 BOM | ||
+ | |||
+ | ==todo== | ||
+ | *knees to MIT | ||
+ | *reboot PC | ||
+ | *rename BATMOD3s | ||
+ | *email GG re CA inspection, CC K and DG | ||
+ | *order digikey parts for BATMOD | ||
+ | |||
+ | =sun dec 5= | ||
+ | *11:30a - 8:40p | ||
+ | **write testing proceedure for batrcp | ||
+ | **debug batrcp3.#0107 | ||
+ | **full bat system validation, tested charger | ||
+ | ** |
Revision as of 02:23, 6 December 2010
- ceb_log todo BMdoc notes hours_1012 hours_1101 hours_1102 hours_1103 lifefix_log T
- garden12 ; emg_2009 ; Enc_2010 ; AKENC ; Kknee1 ; Br46_v1 gps1 ; lifefix ; battery ; loadwasher ; elecdog ; Brushless_control ; ceb_misc_prj ; pf_top_nav ; T
wed dec 1
9a - 10:30p
- extend pre_build script to work with all controllers, add necessary support file to each project
- work with JS and ZH to discover cause of IMU scaling problem
- work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
- work with KMa to assemble and test battery board set
thur dec 2
- 9:15a - 8:15p -3
- kit to L-tronics
- update BOM and PCB docs.
- meet w/RC and ZH re statemachine bug during TS
- review diag code, email on issues.
- complete integration of shared object into IMU
- complete integration of serial number based scaling of IMU data.
fri dec 3
- 9a - 1:40p
- develope bt_config app
- 3pm - 5:30pm
- meet with RB re integration of test alg
- meet with AB on PDA app
- meet with JS on IMU operation and calb table.
- meet with RC on status
sat dec 4
- 10a - 12:30
- develope BATRCP3 inspection and test procedure.
- 1:30p - 10:30p
- work with Khang on board assembly
- work w/DG on inspection / test procedure
- revise BATMOD3 BOM
todo
- knees to MIT
- reboot PC
- rename BATMOD3s
- email GG re CA inspection, CC K and DG
- order digikey parts for BATMOD
sun dec 5
- 11:30a - 8:40p
- write testing proceedure for batrcp
- debug batrcp3.#0107
- full bat system validation, tested charger