Difference between revisions of "Aiw hardware"
From DIDEAS Wiki
m (→pyramid) |
m (→ak2) |
||
Line 5: | Line 5: | ||
==ak2== | ==ak2== | ||
*FET [[Upd_pcb#110-005]], Controller [[Upd_pcb#110-007]] | *FET [[Upd_pcb#110-005]], Controller [[Upd_pcb#110-007]] | ||
− | *Pyramid 5 | + | *[[Aiw_hardware#P5 |Pyramid 5]] |
− | * | + | *[[Aiw_hardware#drive_5 | Drive5]] |
+ | |||
==ak3== | ==ak3== | ||
Line 12: | Line 13: | ||
=pyramid= | =pyramid= | ||
− | == | + | ==2== |
*11-28-08 : to be tested | *11-28-08 : to be tested | ||
− | == | + | ==3== |
*11-28-08 : May have been calibrated in OCT, current on test stand | *11-28-08 : May have been calibrated in OCT, current on test stand | ||
− | == | + | ==4== |
*11-28-08 : to be tested | *11-28-08 : to be tested | ||
− | == | + | ==5== |
*11-28-08 : to be tested. May have been calibrated in OCT | *11-28-08 : to be tested. May have been calibrated in OCT | ||
Revision as of 04:44, 29 November 2008
Contents
system
ak1
ak2
- FET Upd_pcb#110-005, Controller Upd_pcb#110-007
- Pyramid 5
- Drive5
ak3
pyramid
2
- 11-28-08 : to be tested
3
- 11-28-08 : May have been calibrated in OCT, current on test stand
4
- 11-28-08 : to be tested
5
- 11-28-08 : to be tested. May have been calibrated in OCT
motor / assembly
drive 1
- 11-28-08 : verified with +-1.5Amps
drive 2
drive 3
- 11-1-08 : motor frozen
drive 4
drive 5
- 11-28-08 : verified with +-1.5Amps