Difference between revisions of "Todo"
From DIDEAS Wiki
m |
m |
||
Line 1: | Line 1: | ||
+ | =PCB= | ||
+ | ==todo== | ||
+ | * faux SG board | ||
+ | ==almost== | ||
+ | * sg breakouts | ||
+ | ==finished== | ||
+ | * pser1d | ||
+ | * fup1 | ||
+ | |||
+ | |||
+ | |||
+ | |||
= CEB todo= | = CEB todo= | ||
* get IMU working | * get IMU working | ||
Line 13: | Line 25: | ||
* FAB FUP female-female PCB | * FAB FUP female-female PCB | ||
* FAB FUP datalogger. | * FAB FUP datalogger. | ||
− | |||
Revision as of 22:08, 23 December 2008
PCB
todo
- faux SG board
almost
- sg breakouts
finished
- pser1d
- fup1
CEB todo
- get IMU working
- verify does the ankle work.
- ability to switch between Wifi and BT
- add thermal model for motor and ACS712 to state controller
- code to make sure the motor is moving correctly when reseting the encoder.
- learn to use the EEPROM. log SG torque at boot, and during each step.
- make high power bench code
- verify fuses - run high power test on bench with a fuse. (5 ohms should be good)
- Why does statemachine-test not return ADC values?
P2
- FAB FUP female-female PCB
- FAB FUP datalogger.
old
- verify thermal models Thermal data
- build ankle
- test strain gauges
- get ankle state machine running
- need a way to verify that TVS is operational. need to see what effect T has on TVS voltage.
- MC code improvement
- verify Q15 operation of code on MC
- MC feedforward.
- motor controller safety and thermal model for motor and FETs - needs to stop motor....
- motor commands needs to allow readback of selected sensor (so we can cycle through lots of sensors)
- current measurement PCB (with Y voltage measure)
- encoder breakout boards
- SG breakout boards
- new WIFI wireless
Robert Todo
- Order LTC switching regulators - if not done already
- Build Vclamp8 with NEW PFET and 35w resistor
- Ship 1 Vclamp8 to UPD
- When U39 is removed - save and send to Linear Tech for failure analysis
- Verify operation of RE40 encoder new motor test stand. Appears to not be working
- Rewire 8-cell A123 battery pack to 7cell.
- programming cable in PCB repair box is bad.