Hours 1009

From DIDEAS Wiki
Jump to: navigation, search

wed sep 1 2010

  • 6 hrs
  • assist RC w/issues in Tx.
  • set up bria phone
  • discuss magnets w/DG.
  • search for frob radios; review lynx radios
  • work w/ED to test torque verify; seems to be working. modified to make random forward / backward motions
  • chasing bug in printf %d - seems to crash on 9940, 9220? and many values in the 9k

thur sep 2 2010

  • 2:30p - 9:15pm -30


fri sep 3 2010

  • 10:15a - 9:30pm -1hr
    • email on islip
    • recode islip to be its own module.
    • setup email http://cp.appriver.com/
    • discuss infastructure, architecture, and RTOS w/GG and w/JS
    • review TV data
    • matlab development : add final touches to dashboard, modify wild_cvt_all to accept strings, modify TV app to plot data
    • review EXCH bug and modify projects to avoid bug generation in code and libraries
    • matlab, research reading command line arguments.


sat sep 4 2010

  • 11:15a - 11:45  : admin work in Aug invoice
  • 2:50p - 5pm
    • research command line arguments; attempt to compile dashboard.
    • discuss electronics w/RC

sun sep 5 2010

  • 2-5pm
    • move stuff to office
    • dashboard developmnent / compilation

mon sep 6 2010

  • 2pm - 5pm
    • dashboard testing / distribution
  • 1 hr

tue sep 7 2010

  • 4 hrs
    • EMG BOM and digikey order.
    • discuss ENC project status w/CW
    • discuss TV project status w/ED
    • discuss EEprom, python, new hire status w/GG
    • locate firmware for ENC3d, locate components, program PIC24s for installation.

wed sep 8 2010

  • 30 mins - admin
  • 4pm - 8:45p
  • discuss new hire w/GG


thur sep 9 2010

  • 4:00p - 8:45p
    • calb stop #12, #16 debug #16
    • EXCH bug fix causes issues when building firmware.
    • continue to investigate the EXCH bug

fri sep 10 2010

  • 3:15p - 7:30p
    • discuss need for 2.0 robots.
    • review ENC connections w/CA
    • discuss EEPROM logging filesystem and data records.

mon sep 13 2010

  • 12:50p - 11:50p
    • meet w/RC to discuss new hire and project status.
    • review BS ION math w/RC; along with inc-theta non-linearity
    • assist GG w/debug of overloading robot.
    • test firmware to read 16 bits of xxENC3d position
    • verify BS ION, find that a bias improves the results.

tue sep 14 2010

  • 11:20a - 7:15p
    • AB training


wed sep 15 2010

  • 12:30p - 7:15p
    • AB training
      • completes program to get and pretty print EEPROM
    • TV and calb #10, #16, #21
    • discuss EEsfs w/JS
  • 9:55p-11:50p
    • investigate issues w/PSER2h PCBs
    • recalb #10, upgrade firmware and test w/TV
    • modify real_calb_stop to ignore outliers with commref.
    • issues w/#21
    • update twiki,

thur sep 16 2010

  • 1pm - 10:15p -1
    • discussion w/JS, AB on what EEPROM is being read/written to; JS EEPROM was disabled.
    • investigate #21 issues, modify firmware to fix supply voltage and pitch velocity.
    • investigate use of xxENC3d sensor in robot.
    • AB
      • locates python to parse C header files and data structure tree
      • starts project to read text file and fill in a data structure taken from .h file; will support 'comments', a table identification, and a list of fields. key, value pairs will use split


fri sep 17 2010

  • 3:30p - 6:50p
    • work w/DG to do hard stop calibration
    • AB
      • review possibly logging
      • discuss file system decoding and how to go about testing.


mon sep 20 2010

  • 1.5 hrs :
    • emails, discuss project status w/Rc, general assistance at IW

tue sep 21 2010

  • 1.0 hrs
    • meet with AB, emails, general assistance at IW
  • 1.5 hrs
    • eeprom FS creating / simulation

wed sep 22 2010

mon sep 27 2010

  • 12:30 - 1:45p
    • meet with KB re acoustic measurement
    • meet w/AB re status.

tue sep 28 2010

  • 5.30 - 9:30p
    • setup PC
    • review AAS data w/DG and RC

wed sep 29 2010

  • 3:50p - 9p
    • discuss prj w/AB
    • interview R
    • discuss enc w/CW
    • discuss prj w/AB and JS
    • work w/DG and AB on LTF
    • discuss R w/GG
    • discuss AAS w/CA

thur sep 30 2010

  • 7p-10:30p
    • discuss changes to firmware w/JS
    • investigate AKENC3 issues, study noise output